Project Details
The Brass LNG project was awarded in 2008 by ACCL.
This included: APC Infrastructure X solution, Cisco Data Centre, Unified Collaboration, IP CCTV, logical and Physical Access Control, installation and integration of Petra Chillers.
We built the data centre with APC cooling, UPS Systems and racks, this solution had In row units with fans and condensers with a CDU (Central Distribution Unit) for Cold and hot water distribution within the systems, we integrated the APC cooling units with a Petra Chiller for Cold water supply through a controlled valve system. The cold supply is distributed and the warm water is returned back to the Chiller and all this happens within a controlled environment.
The data centre was built on Cisco infrastructure for the routing and switching, IP Telephony with enterprise call managers Cisco and voice messaging system, the logical and physical access systems were integrated back into the data centre for Single-Sign-on capabilities.